Two halves meet again
Today was an interesting day! First of all, I brought the body and chassis back together. Secondly, I now have a lot more space to work after stacking the body on the chassis. I have a tendency to work all out which also leads to all my tools left out. I see this as a two to three day process to organize the space. Now the fun begins: Lots of plumbing for the hydroboost Mount the remote power steering reservoir Resolving the clearance between the hydroboost and valve cover (thinking about angling the unit up 3 degrees) Plumbing the fuel regulator and filter to the fuel rails. I decided to do a full loop up to the engine to mitigate any heat issues. Install the Vintage Air system Install the Holley Terminator X Max New differential installed and ready to go!